Irving Shipbuilding has commenced sea trials for the future CCGS Donjek, the Canadian Coast Guard’s first Arctic and Offshore Patrol Ship (AOPS), off the coast of Nova Scotia.
Embarking a specialized technical team from Irving Shipbuilding alongside Coast Guard engineering and operational crew members, the rigorous at-sea evaluation subjects the 104.7-meter vessel to full-power propulsion runs, steering maneuvers, sea-state seaworthiness trials, and validation of combat/navigation sensors, electrical grids, and auxiliary machinery. The milestone follows the ship’s successful launch from the Halifax Shipyard in April 2026 and sets the stage for final fit-out, customer acceptance, and official delivery to the Canadian Coast Guard. Meanwhile, structural fabrication and outfit integration continue on schedule at Halifax Shipyard for the second and final Coast Guard AOPS, the future CCGS Sermilik, which follows the successful delivery of six military-variant Harry DeWolf-class AOPS (HMCSS Harry DeWolf, Margaret Brooke, Max Bernays, William Hall, Frédérick Rolette, and Robert Hampton Gray) to the Royal Canadian Navy.
TECHNICAL SPECIFICATIONS: CANADIAN COAST GUARD ARCTIC AND OFFSHORE PATROL SHIP (CCGS DONJEK) ARCHITECTURE
1. Hull Construction, Ice-Strengthening & Dimensions
⚡ Prime Contractor & Shipyard: Irving Shipbuilding (Halifax Shipyard, Nova Scotia); custom-configured Coast Guard variant derived from the Royal Canadian Navy’s proven Harry DeWolf-class design
⚡ Dimensions & Displacement: Length overall (LOA) of 104.7 meters (343 feet 6 inches), beam of 19.0 meters, and a full-load displacement of approximately 6,613 tonnes
⚡ Ice-Strengthening Class: Built to **ABS Polar Class 4** standards, featuring a heavily reinforced bow and robust steel framing designed to break multi-year sea ice up to 1 meter thick at a continuous speed of 3 knots
2. Propulsion, Mission Systems & Multirole Capabilities
💥 Propulsion & Powerplant: Powered by an integrated diesel-electric propulsion (IDEP) system combining four MAN 32/44CR diesel generators driving two shafts, delivering a top speed of 17 knots in open water and an economic cruising speed of 14 knots with an endurance of up to 45 days
💥 Aviation Facilities & Crane: Equipped with an enclosed helicopter hangar and flight deck capable of handling medium utility helicopters (such as the Bell 412 or CH-148 Cyclone), supplemented by a heavy-duty hydraulic crane for over-the-side deployment of boats and cargo
💥 Multi-Mission Mandate: Designed to serve as the Coast Guard’s primary multi-role platform for heavy fisheries enforcement on Canada’s Atlantic coast, offshore search and rescue (SAR), light icebreaking, and asserting sovereign presence across Arctic waters during summer navigation seasons
